| 1 |
GMP readiness and documentation |
Quality manual, document-control procedure, change-control process, nonconformance and CAPA procedures, and sample equipment records. |
Check that documents are controlled, attributable, reviewable, and appropriate to the machine’s intended use. Do not treat a general “GMP certificate” claim as proof of equipment suitability. |
GMP obligations depend on the regulated operation and applicable market; equipment should be assessed and qualified for its intended use. |
| 2 |
ISO 9001 quality management system |
Current ISO 9001:2015 certificate, certification-body details, certificate scope, covered manufacturing site, and expiry or validity status. |
Verify the certificate with the issuer or accreditation directory and confirm that the scope and site cover the activities relevant to the equipment supplied. |
ISO 9001 concerns a quality management system; certification alone does not establish machine performance, GMP compliance, or container-closure integrity. |
| 3 |
Requirements and design traceability |
User-requirement review, functional specification, design review records, and a traceability matrix linking requirements to tests. |
Confirm that critical requirements—container formats, closure types, operating range, alarms, data handling, and safety functions—have defined verification methods. |
Traceability helps show that the delivered machine was designed and tested against agreed requirements. |
| 4 |
Factory and site acceptance testing |
Approved FAT and SAT protocols, test results, deviation records, and customer sign-off templates. |
Agree in advance on test materials, container formats, line conditions, acceptance limits, sampling plan, and how deviations will be resolved. |
FAT and SAT provide documented checks at the supplier’s site and after installation at the user’s site. |
| 5 |
Installation and operational qualification support |
Equipment specifications, installation checks, calibration records, operating procedures, training records, and draft IQ/OQ protocols where agreed. |
Confirm responsibilities, required deliverables, protocol approval, deviations, and requalification expectations before purchase. |
Qualification should be planned around intended use and the user’s quality system; a supplier’s protocol does not replace the user’s approval. |
| 6 |
Container-closure integrity (CCI) evidence |
Crimping process study, closure inspection results, defect definitions, and any package-integrity test protocol relevant to the specific container system. |
Assess the complete container-closure system. Where applicable, use a justified, validated method and product-specific acceptance criteria; USP <1207> provides guidance on package integrity evaluation. |
CCI depends on the container, closure components, product, and process. No single universal leak limit applies to every package. |
| 7 |
Crimp-process control and repeatability |
Set-up parameters, adjustment instructions, in-process inspection method, representative trial results, and records for alarms or rejected units. |
Evaluate performance across agreed container and closure formats and operating conditions. Set measurable limits with the supplier based on the product and process risk. |
A stable, controlled crimping process supports consistent closure formation; nominal speed alone does not demonstrate quality. |
| 8 |
Format range and changeover |
Approved format list, change-part drawings or identifiers, changeover instructions, and demonstration results for requested formats. |
Verify compatibility using the buyer’s actual vials, stoppers, and caps. Record changeover steps and confirm repeatable set-up after format changes. |
Compatibility and changeover performance are specific to the container-closure combination, not just nominal container dimensions. |
| 9 |
Machine safety and risk assessment |
Machine risk assessment, safety-function descriptions, guarding details, operating instructions, and applicable conformity documentation for the destination market. |
Review hazards, access points, interlocks, emergency stops, and maintenance safety. ISO 12100 is a recognized framework for machinery risk assessment and risk reduction. |
Safety requirements depend on machine design and destination-market regulations; request evidence relevant to the intended installation. |
| 10 |
Service, spare parts, and lifecycle support |
Recommended spare-parts list, service escalation process, maintenance schedule, training plan, software-support terms, and warranty conditions. |
Agree response arrangements, parts availability, documentation updates, and support responsibilities in the contract rather than relying on general assurances. |
Clear lifecycle support arrangements help manage downtime and preserve equipment knowledge after installation. |